What is Developing? Open the mapMap

Cleared for impact studyIndustry · Maldah, West Bengal

Setting up manufacturing unit of Synthetic Resin viz. Urea-Formaldehyde (U-F) Resin, Melamine - Formaldehyde (M-F) Resin and Phenol-Formaldehyde (P-F) Resin with total production capacity of 12000 TPA

Setting up manufacturing unit of Synthetic Resin viz. Urea-Formaldehyde (U-F) Resin, Melamine - Formaldehyde (M-F) Resin and Phenol-Formaldehyde (P-F) Resin with total production capacity of 12000 TPA is a proposed industrial project in Syamlalpara, Maldah (Old), Maldah, West Bengal. The site covers 0.4 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Oct 2023).

See it on the live map All projects in Maldah

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since19 Oct 2023
Application filed19 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantS S B Chemical Industries
Land area1,500 m²
Project cost₹85 lakh
Village / localitySyamlalpara
Taluk / tehsilMaldah (Old)
DistrictMaldah
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00153

In context

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Syamlalpara, Maldah (Old), Maldah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.