Quick answers
What is this project?
Proposed Expansion of Existing Aluminum Foil Rolling Mill From 80MT/ Day To 120 MT/Day located at Plot No. 1920, 1904, 1902, 1912, 1918, Mouza- Pakuria, J.L. No. 54, P.S. Domjur, District- Howrah, West Bengal is a rejected industrial project in Baidyanathpur, Domjur, Howrah, West Bengal. The site covers 5.4 acres.
Who is building it?
The applicant is Shyam Sel & Power Limited.
Has it been approved?
No. The application was rejected on 5 Aug 2024.
Where is it?
In Baidyanathpur, Domjur, Howrah, West Bengal.
How big is it?
It has a stated cost of ₹144.2 crore and a site of 5.4 acres.
When was it filed?
The application was filed on 27 Mar 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 5 Aug 2024 |
| Application filed | 27 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shyam Sel & Power Limited |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹144.2 crore |
| Village / locality | Baidyanathpur |
| Taluk / tehsil | Domjur |
| District | Howrah |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00172 |
In context
35 applications in Howrah since January 2022 are in the same category (Industry): 25 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.4 acres, this one is smaller than 68% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baidyanathpur, Domjur, Howrah, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of Environmental Clearance for proposed Modification of Township… — lapsed, 750 m away
- Proposed Construction of 3 Nos. G+one Storied Building at Block A,b,c… — environmental approval granted, 1 km away
- Environmental Clearance for Proposed Expansion of JIS School of Medical… — under environmental review, 3.1 km away
- Proposed Modification cum Expansion of GARMENT and LOGISTIC PARK at Mouza-… — environmental approval granted, 3.7 km away
- Environmental Clearance for Proposed LOGISTIC PARK by M/s. PS Logistic Park… — environmental approval granted, 3.8 km away
- Proposed setup of R & D cum manufacturing unit for Drugs & Intermediate and… — cleared for impact study, 3.9 km away
- Residential cum Commercial complex by Vishwam Megapolis LLP — environmental approval granted, 5.3 km away
- Expansion of Commercial Building for Trading (Business) & Other Allied… — environmental approval granted, 5.3 km away
All 16 Shyam Sel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.