Project details
| Official title | Proposed expansion of the existing DRI Plant (2x100 TPD Kiln) by installing additional 1x600 TPD Kiln, along with Steel Melting Shop (Induction Furnace)- 5x20 Ton, Strip Mill- 1,50,000 TPA, Tube Mill-1,20,000 TPA, Galvanised Plant- 60,000 TPA, Profile Mill- 24,000 TPA, Structure Mill- 1,50,000 TPA, Ferro Alloys- (4x9 MVA Sub-merged Arc Furnace), Producer Gas Plant- 2x10,000 Nm3/hr, Rolling Mill (TMT & Wire Rod)- 3,60,000 TPA and 25 MW Captive Power Plant (16 MW WHRB & 9 MW AFBC) |
|---|---|
| Status | Cleared for impact study |
| Status since | 25 Apr 2024 |
| Application filed | 14 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shivam Dhatu Udyog Private Limited |
| Land area | 62 acres (25.1 ha) |
| Project cost | ₹450 crore |
| Village / locality | Ikra |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00179 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 62 acres, this one is larger than 66% of them.
65 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ikra, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Shivam Dhatu Udyog Private Limited — withdrawn, 0 m away
- Proposed Expansion Cum Modification of Existing Steel Plant by Increasing… — more information requested, 450 m away
- Proposed Expansion Cum Modification of Existing Steel Plant by Increasing… — cleared for impact study, 450 m away
- Enhancement of Sponge Iron Production from 117,000 to 177,000 TPA, Billet… — lapsed, 450 m away
- Enhancement of Sponge Iron Production from 117,000 to 177,000 TPA, Billet… — environmental approval granted, 450 m away
- Enhancement of Sponge Iron Production from 117,000 to 177,000 TPA, Billet… — withdrawn, 450 m away
- Application for "No Increase in Pollution Load" Certificate for Increase in… — initial checks, 600 m away
- No increase in Pollution Load for Proposed change in fuel mix from Coal to… — initial checks, 650 m away
More from Shivam Dhatu Udyog Private Limited in Paschim Bardhaman
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.