Quick answers
What is this project?
Seeking amendment in Terms of Reference accorded by the Ministry vide letter no. IA-J-11011/448/2021-IA. II(I) dated 25.11.2021 for installation of Synthetic Resin Production Unit (UF & MUF Resin) within the existing Plywood Manufacturing Plant by M/s Laxmi Timber Industries at J.L. No 104, Plot No 362,364,365,366,367,390,392,394,395,397,398,411 ,416 & 417 (L.R), Khatian No 332/1, Vill + P.O - Balakuthi (Joraimore), P.S – Boxirhat, Dist. – Cooch Behar, West Bengal is a proposed industrial project in Balakuthi, Tufanganj - Ii, Cooch Behar, West Bengal. The site covers 4.5 acres.
Who is building it?
The applicant is Laxmi Timber Industries.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Balakuthi, Tufanganj - Ii, Cooch Behar, West Bengal.
How big is it?
It has a stated cost of ₹3.4 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 1 Sept 2023.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 10 Sept 2023 |
| Application filed | 1 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Laxmi Timber Industries |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹3.4 crore |
| Village / locality | Balakuthi |
| Taluk / tehsil | Tufanganj - Ii |
| District | Cooch Behar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00196 |
In context
5 applications in Cooch Behar since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balakuthi, Tufanganj - Ii, Cooch Behar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of Synthetic Resin Production Unit (UF & MUF Resin) within the… — cleared for impact study, 0 m away
- Jaldhoa Sand Mine (MIN_CB_16) — under environmental review, 11.7 km away
- Jaldhoa Sand Mine (MIN_CB_16) — environmental approval granted, 11.7 km away
- Dhalpal Sand Mine (MIN_CB_17) — environmental approval granted, 11.9 km away
- Madhurbhasa Sand Mine (MIN_CB_23) — environmental approval granted, 13.9 km away
- Balarampur Sand Mine (MIN_CB_18) — environmental approval granted, 15.9 km away
- Kunidanga Sand Mine (MIN_CB_7) — environmental approval granted, 23.4 km away
- Sitalkuchi Sand Mine (MIN_CB_11) — environmental approval granted, 48 km away
More from Laxmi Timber Industries in Cooch Behar
- Regularization of Synthetic Resin Production Unit (UF & MUF Resin) within the… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.