Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Mar 2023 |
| Application filed | 30 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nitu Dubey |
| Land area | 8.6 acres (3.5 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Antaram |
| Taluk / tehsil | Kharibari |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00204 |
In context
47 applications in Darjiling since January 2022 are in the same category (Mining): 15 approved, 11 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.6 acres, this one is larger than 54% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Antaram, Kharibari, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project (MIN_DJ_01) on Mechi River of Dist. Darjeeling — environmental approval granted, 700 m away
- Sand Mining Project (MIN_DJ_01) on Mechi River of Dist. Darjeeling — not approved, 700 m away
- River Bed Mineral Mining (Block ID - MIN_DJ_1) on Mechi River — cleared for impact study, 700 m away
- Bhulka Sand and Stone Mine (Khoribari Part I) — under environmental review, 1.1 km away
- Madan Part III — not approved, 1.2 km away
- Madan Sand Mine (MIN_DJ_15) — more information requested, 1.3 km away
- Salbari Sand Mine — environmental approval granted, 8.3 km away
- IOCL Terminal Siliguri (India) to Jhapa Terminal (Nepal) Pipeline — more information requested, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.