Ferro Alloy Plant through setting up of 2x9 MVA Submerged Arc Furnaces for production of Ferro Manganese (18000 TPA) and Silico Manganese (12000 TPA) & Sinter Plant (9000TPA) by M/s. Shyam Business Solution Pvt. Ltd. at Raturia, Angadpur Industrial Area, Tehsil – Durgapur Dist. – Paschim Bardhaman, West Bengal

Ferro Alloy Plant through setting up of 2x9 MVA Submerged Arc Furnaces for production of Ferro Manganese (18000 TPA) and Silico Manganese (12000 TPA) & Sinter Plant (9000TPA) by M/s. Shyam Business Solution Pvt. Ltd. at Raturia, Angadpur Industrial Area, Tehsil – Durgapur Dist. – Paschim Bardhaman, West Bengal is an approved industrial project in Raturia, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The site covers 5.6 acres. Its stated project cost is ₹45 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Feb 2025).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed installation of the Ferro Alloy Plant through setting up of 2x9 MVA Submerged Arc Furnaces for production of Ferro Manganese (18000 TPA) and Silico Manganese (12000 TPA) & Sinter Plant (9000TPA) by M/s. Shyam Business Solution Pvt. Ltd. at Raturia, Angadpur Industrial Area, Tehsil – Durgapur Dist. – Paschim Bardhaman, West Bengal
StatusEnvironmental approval granted
Status since11 Feb 2025
Application filed7 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantShyam Business Solution PVT LTD
Land area5.6 acres (2.3 ha)
Project cost₹45 crore
Village / localityRaturia
Taluk / tehsilFaridpur Durgapur
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00434

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.6 acres, this one is smaller than 92% of them.

27 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Raturia, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.