Project details
| Status | Returned to applicant |
|---|---|
| Status since | 17 Jan 2025 |
| Application filed | 21 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Great Eastern Energy Corporation Limited |
| Land area | 59 acres (23.9 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Bartaria |
| Taluk / tehsil | Asansol Kulti Township |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00506 |
In context
94 applications in Paschim Bardhaman since January 2022 are in the same category (Mining): 58 approved, 22 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 59 acres, this one is larger than 70% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bartaria, Asansol Kulti Township, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Steel Authority of India Limited-IISCO Steel Plant — withdrawn, 3 km away
- Modernization and Expansion of Capacity From 2.5 to 7.1 Mtpa Crude Steel of… — environmental approval granted, 3.3 km away
- Modernization and Expansion of Capacity From 2.5 to 7.1 Mtpa Crude Steel of… — cleared for impact study, 3.3 km away
- Centralized Administrative & HRD Complex and Project Office Building — environmental approval granted, 3.5 km away
- Development of Non-Executive Residential Housing — environmental approval granted, 4 km away
- Cluster no. 6 group of 7 UG mines, production capacity 1.25 MTY in ML area of… — lapsed, 5.8 km away
- Proposed Chinakuri Underground Coal Mine (Target Capacity: 1.0 MTPA, ML area… — lapsed, 6.4 km away
- Girmint-Kd Incline Ug Coal Mine — under environmental review, 11.9 km away
All 4 Great Eastern Energy Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.