Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jul 2024 |
| Application filed | 25 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Saswata Mondal |
| Land area | 5.1 acres (2.1 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Debagram |
| Taluk / tehsil | Mohammad Bazar |
| District | Birbhum |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00565 |
In context
161 applications in Birbhum since January 2022 are in the same category (Mining): 82 approved, 30 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.1 acres, this one is smaller than 71% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Debagram, Mohammad Bazar, Birbhum, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power Evacution From Panchami Gss — lapsed, 5.1 km away
- Hatgachha Blackstone Block — environmental approval granted, 7.6 km away
- Expansion of manufacturing plant of laminated sheet and proposed synthetic… — environmental approval granted, 7.6 km away
- Expansion of manufacturing plant of laminated sheet and proposed synthetic… — cleared for impact study, 7.6 km away
- Hatgachha Blackstone Mine (Block ID – BIR/BS/2024/4) — environmental approval granted, 7.8 km away
- Deocha Pachami Basalt Block — environmental approval granted, 7.9 km away
- Hatgachha Black Stone Project — under environmental review, 7.9 km away
- Hatgachha Black Stone Project — withdrawn, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.