Quick answers
What is Bherbheri Manabari River bed sand Mine?
Bherbheri Manabari River bed sand Mine is an approved mining project in Bherbheri, Mathabhanga Ii, Cooch Behar, West Bengal.
Who is building it?
The applicant is Ganesh Berman.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 May 2024), as of 27 Nov 2026.
Where is it?
In Bherbheri, Mathabhanga Ii, Cooch Behar, West Bengal.
How big is it?
It has a stated cost of ₹60 lakh.
When was it filed?
The application was filed on 13 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 May 2024 |
| Application filed | 13 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ganesh Berman |
| Project cost | ₹60 lakh |
| Village / locality | Bherbheri |
| Taluk / tehsil | Mathabhanga Ii |
| District | Cooch Behar |
| State | West Bengal |
| Location from | Site area on record |
| Our reference | WID-WB-00608 |
In context
18 applications in Cooch Behar since January 2022 are in the same category (Mining): 14 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bherbheri, Mathabhanga Ii, Cooch Behar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Resin Production Unit (UF, PF, & MUF Resin) by M/s. MOHATA… — environmental approval granted, 5.6 km away
- Proposed Synthetic Resin Production Unit (UF, PF, & MUF Resin) by M/s. MOHATA… — cleared for impact study, 5.6 km away
- Jorpatki Sand Mine (MIN_CB_14) — environmental approval granted, 6.3 km away
- Jatamari Sand Mine (MIN_CB_13) — environmental approval granted, 7.1 km away
- Sitalkuchi Sand Mine (MIN_CB_11) — environmental approval granted, 8.5 km away
- Mahishmuri Riverbed Sand Mine — environmental approval granted, 11.4 km away
- Environmental Clearance for Proposed Synthetic Resin Production Unit (UF, PF,… — under environmental review, 17.2 km away
- Min_cb_12 — environmental approval granted, 20.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.