Returned to applicantIndustry · Paschim Bardhaman, West Bengal

Proposed expansion project for the manufacture of 4,36,500 TPA billets by installation of 6X25 Ton Induction Furnaces, 2X30 Ton Ladle Refining Furnaces, 2 nos. 6/11, 3 strand Continuous Billet Caster.

Proposed expansion project for the manufacture of 4,36,500 TPA billets by installation of 6X25 Ton Induction Furnaces, 2X30 Ton Ladle Refining Furnaces, 2 nos. 6/11, 3 strand Continuous Billet Caster is a proposed industrial project in Gopinathpur, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The site covers 23.8 acres. Its stated project cost is ₹22.5 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 23 Oct 2024).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion project for the manufacture of 4,36,500 TPA billets by installation…

Project details

StatusReturned to applicant
Status since23 Oct 2024
Application filed30 Sept 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantSrmb Srijan Private Limited
Land area23.8 acres (9.6 ha)
Project cost₹22.5 crore
Village / localityGopinathpur
Taluk / tehsilFaridpur Durgapur
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00616

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 7 Nov 2024Environmental approval granted23.8 acres₹32.7 crore
Amendment filed 30 Sept 2024 (this page)Returned to applicant23.8 acres₹22.5 crore

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.8 acres, this one is smaller than 59% of them.

34 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gopinathpur, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Srmb Srijan Private Limited in Paschim Bardhaman

All 3 Srmb Srijan projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.