One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion project for the manufacture of 4,36,500 TPA billets by installation…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 30 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Srmb Srijan Private Limited |
| Land area | 23.8 acres (9.6 ha) |
| Project cost | ₹22.5 crore |
| Village / locality | Gopinathpur |
| Taluk / tehsil | Faridpur Durgapur |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00616 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 7 Nov 2024 | Environmental approval granted | 23.8 acres | ₹32.7 crore |
| Amendment filed 30 Sept 2024 (this page) | Returned to applicant | 23.8 acres | ₹22.5 crore |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.8 acres, this one is smaller than 59% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopinathpur, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion project for the manufacture of 4,36,500 TPA billets by… — environmental approval granted, 0 m away
- Proposed Expansion of Existing Steel Plant by Installation of 2x30 T Induction… — environmental approval granted, 0 m away
- Proposed Expansion of capacity from 67 KTPA to 80 KTPA at JL No. 85 &92,… — environmental approval granted, 600 m away
- Expansion of Structural Mill from 1,19,988 TPA to 1,50,000 TPA and installing… — under environmental review, 750 m away
- Expansion of existing plant – Steel Melting Shop- - 59,400 TPA (2 x 9 T-I.F)… — returned to applicant, 750 m away
- Expansion of Existing Structural Rolling Mill (1,05,600 TPA) by Installation… — environmental approval granted, 1.7 km away
- Expansion of Existing Structural Rolling Mill (1,05,600 TPA) by Installation… — cleared for impact study, 1.7 km away
- Expansion of existing structure mill from 60,000 TPA to 1,95,840 TPA by SPS… — lapsed, 1.7 km away
More from Srmb Srijan Private Limited in Paschim Bardhaman
- Proposed Expansion of Existing Steel Plant by Installation of 2x30 T Induction… — environmental approval granted
All 3 Srmb Srijan projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.