Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 May 2025 |
| Application filed | 23 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Masum Hossain Choudhury |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹5 crore |
| Village / locality | Tarachua |
| Taluk / tehsil | Rampurhat - I |
| District | Birbhum |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00634 |
In context
161 applications in Birbhum since January 2022 are in the same category (Mining): 82 approved, 30 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.6 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Tarachua, Rampurhat - I, Birbhum, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tarachua Blackstone Mine — cleared for impact study, 250 m away
- Tarachua Blackstone Mine — cleared for impact study, 500 m away
- Tarachua Black Stone Deposit — initial checks, 700 m away
- Tarachua Blackstone Mine — cleared for impact study, 800 m away
- Tarachua Blackstone Block (MM-I, MM-II) Of Merila Murmu — environmental approval granted, 1.2 km away
- Tarachua Black Stone Mine Block — more information requested, 1.7 km away
- Senbandha Blackstone Block — environmental approval granted, 3.4 km away
- Senbandha Blackstone Block — cleared for impact study, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.