Project details
| Official title | Proposed Expansion by Installation of Induction Furnace (5 X 25 T) With Matching Ccm for Production of 3,37,500 Tpa M.S. Billets Along With 3,20,000 Tpa Structural Mill With Matching Reheating Furnace, Oxygen Plant-60 Tpd, Whrb Based 06 MW Captive Power Plant and Keeping Coke Oven Plant Capacity As IT Is I.E. 90,000 Tpa. |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 Dec 2024 |
| Application filed | 15 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Wellman Carbo Metalicks India Limited |
| Land area | 16 acres (6.5 ha) |
| Project cost | ₹273.3 crore |
| Village / locality | Mathura Kismat |
| Taluk / tehsil | Kharagpur - I |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00830 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 15 Oct 2024 (this page) | Environmental approval granted | 16 acres | ₹273.3 crore |
| Expansion filed 26 Feb 2024 | Environmental approval granted | 16 acres | ₹273.3 crore |
| Early planning filed 11 Apr 2023 | Cleared for impact study | 16 acres | ₹273.3 crore |
In context
43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16 acres, this one is smaller than 86% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mathura Kismat, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion by Installation of Induction Furnace (5 X 25 T) With… — environmental approval granted, 0 m away
- Proposed Expansion by Installation of Induction Furnace (5 X 25 T) With… — cleared for impact study, 0 m away
- 'change of Name of Environment Clearance Accorded Units'- Proposed Expansion… — environmental approval granted, 50 m away
- 'change of Name of the Company in Environment Clearance Accorded Units'-… — environmental approval granted, 300 m away
- Assessment of No Increase in Pollution Load for expansion of DRI plant… — initial checks, 400 m away
- 'Change of name of the company in Environment Clearance accorded units'-… — environmental approval granted, 450 m away
- 'Splitting of Environment Clearance' - 10 x 20 T (0.6 MTPA) Induction Furnace… — environmental approval granted, 500 m away
- Transfer of EC granted by MoEF&CC vide no. J-11011/377/2013-IA-II(I) from Tata… — environmental approval granted, 600 m away
All 3 Wellman Carbo Metalicks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.