What is Developing? Open the mapMap

Environmental approval grantedIndustry · Medinipur West, West Bengal

Proposed Expansion by Installation of Induction Furnace (5 X 25 T) With Matching Ccm for Production of 3,37,500 Tpa M.S. Billets

Proposed Expansion by Installation of Induction Furnace (5 X 25 T) With Matching Ccm for Production of 3,37,500 Tpa M.S. Billets is an approved industrial project in Mathura Kismat, Kharagpur - I, Medinipur West, West Bengal. The site covers 16 acres. Its stated project cost is ₹273.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 31 Dec 2024).

See it on the live map All projects in Medinipur West

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed Expansion by Installation of Induction Furnace (5 X 25 T) With Matching Ccm for Production of 3,37,500 Tpa M.S. Billets Along With 3,20,000 Tpa Structural Mill With Matching Reheating Furnace, Oxygen Plant-60 Tpd, Whrb Based 06 MW Captive Power Plant and Keeping Coke Oven Plant Capacity As IT Is I.E. 90,000 Tpa.
StatusEnvironmental approval granted
Status since31 Dec 2024
Application filed15 Oct 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantWellman Carbo Metalicks India Limited
Land area16 acres (6.5 ha)
Project cost₹273.3 crore
Village / localityMathura Kismat
Taluk / tehsilKharagpur - I
DistrictMedinipur West
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-00830

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 15 Oct 2024 (this page)Environmental approval granted16 acres₹273.3 crore
Expansion filed 26 Feb 2024Environmental approval granted16 acres₹273.3 crore
Early planning filed 11 Apr 2023Cleared for impact study16 acres₹273.3 crore

In context

43 applications in Medinipur West since January 2022 are in the same category (Industry): 27 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16 acres, this one is smaller than 86% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mathura Kismat, Kharagpur - I, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Wellman Carbo Metalicks projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.