What is Developing? Open the mapMap

Environmental approval grantedMining · Bankura, West Bengal

Expansion of Exploration and Production of 650 Nos. of Coal Bed Methane Gas Wells in Raniganj (South) Cbm Block, West Bengal by M/S. Great Eastern Energy Corporation Limited.

Expansion of Exploration and Production of 650 Nos. of Coal Bed Methane Gas Wells in Raniganj (South) Cbm Block, West Bengal by M/S. Great Eastern Energy Corporation Limited is an approved mining project in Uttar Asanbani, Saltora, Bankura, West Bengal. The site covers 59 acres. Its stated project cost is ₹8 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 May 2025).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Exploration and Production of 650 Nos. of Coal Bed Methane Gas Wells in Raniganj (South) Cbm Block, West Bengal by M/S. Great Eastern Energy Corporation Limited is an approved mining project in Uttar Asanbani, Saltora, Bankura, West Bengal. The site covers 59 acres.

Who is building it?

The applicant is Great Eastern Energy Corporation Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 May 2025), as of 27 Nov 2026.

Where is it?

In Uttar Asanbani, Saltora, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹8 lakh and a site of 59 acres.

When was it filed?

The application was filed on 31 Mar 2025.

Project details

StatusEnvironmental approval granted
Status since9 May 2025
Application filed31 Mar 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantGreat Eastern Energy Corporation Limited
Land area59 acres (23.9 ha)
Project cost₹8 lakh
Village / localityUttar Asanbani
Taluk / tehsilSaltora
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01062

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 31 Mar 2025 (this page)Environmental approval granted59 acres₹8 lakh
Expansion filed 6 Jun 2024Returned to applicant59 acres₹8 lakh

In context

216 applications in Bankura since January 2022 are in the same category (Mining): 146 approved, 54 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 59 acres, this one is larger than 89% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Uttar Asanbani, Saltora, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Great Eastern Energy Corporation Limited in Bankura

3 Great Eastern Energy Corporation projects in Bankura
All 4 Great Eastern Energy Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.