Project details
| Official title | Proposed an Integrated Steel Plant of 3.1 Million Ton per annum (Finished Steel) along with 230MW (80MW WHRB/TRT based +150 MW coal based) Captive Power Plant |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Nov 2025 |
| Application filed | 23 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Rashmi Green Hydrogen Steel Private Limited |
| Land area | 531.2 acres (215 ha) |
| Project cost | ₹2,900 crore |
| District | Other |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01075 |
Where it is
Other, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4/6 lane (Greenfield) access control expressway from Varanasi to Kolkata… — under forest review, 71.2 km away
- 4/6 lane (Greenfield) access control expressway from Varanasi to Kolkata… — under forest review, 71.2 km away
- 4/6 lane (Greenfield) access control expressway from Varanasi to Kolkata… — under environmental review, 71.2 km away
- Proposed Steel Plant (Green-Field Project) by installation of 2x650 TPD DRI… — more information requested, 152.9 km away
- Gangaramchak & Gangaramchak-Bhadulia Coal Mine — environmental approval granted, 166 km away
- Common Bio Medical Waste Treatment Facility at Sagardighi, Dist. –… — environmental approval granted, 235.9 km away
- Common Bio Medical Waste Treatment Facility at Sagardighi, Dist. –… — environmental approval granted, 235.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.