Project details
| Status | Not approved |
|---|---|
| Status since | 17 Apr 2025 |
| Application filed | 22 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ankur Biochem Private Limited |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Palash |
| Taluk / tehsil | Matigara |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01091 |
In context
47 applications in Darjiling since January 2022 are in the same category (Mining): 15 approved, 11 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.4 acres, this one is smaller than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Palash, Matigara, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Duramarir Chhat Sil 22 on Mahananda River — not approved, 450 m away
- Duramarir Chhat Sand & Stone Mine — not approved, 550 m away
- Purbo Pashunath Sand Mine (MIN_DJ_19) — more information requested, 550 m away
- Resort Building by L.R Agro Product Private Limited — environmental approval granted, 5 km away
- Pipe Water supply scheme for Mahandhi Forest PWSS under Jal Jeevan Mission. — forest land use approved, 5.3 km away
- Pipe Water supply scheme for Mahandhi Forest PWSS under Jal Jeevan Mission. — decision issued, 5.3 km away
- "SHUBH VATIKA" Proposed Construction of (G + 5) Storied Residential & 3… — not approved, 6.6 km away
- Pipe Water Supply Scheme for Sukna Pratham Khanda PWSS under Jal Jeevan Mission — forest land use approved, 7.3 km away
More from Ankur Biochem Private Limited in Darjiling
- Duramarir Chhat Sil 22 on Mahananda River — not approved
- Duramarir Chhat Sand & Stone Mine — not approved
3 Ankur Biochem projects in Darjiling
All 6 Ankur Biochem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.