Returned to applicantIndustry · Bankura, West Bengal

Proposed Integrated Steel plant: Sponge Iron (4,29,000 TPA), SMS with LRF, CCM & MRP (4,12,500 TPA), SAF (max.1,07,136 TPA) {71,424 TPA Si-Mn/ 97,029 TPA Fe-Mn/ 32,141 TPA Fe-Si/ 67,665 TPA Fe-Cr/ 44,332 TPA Fe-Si-Cr/ 1,07,136 TPA Pig Iron or combination of any) including Briquetting plant (1,65,000 TPA) & Sinter plant (1,65,000 TPA), EAF (52,800 TPA Low Carbon Fe-Cr) & MRP, Rolling Mill (3,96,000 TPA) & 80 MW Captive Power Plant (40 MW WHRB & 40 MW CFBC)

Proposed Integrated Steel plant: Sponge Iron (4,29,000 TPA), SMS with LRF, CCM & MRP (4,12,500 TPA), SAF (max.1,07,136 TPA) {71,424 TPA Si-Mn/ 97,029 TPA Fe-Mn/ 32,141 TPA Fe-Si/ 67,665 TPA Fe-Cr/ 44,332 TPA Fe-Si-Cr/ 1,07,136 TPA Pig Iron or combination of any) including Briquetting plant (1,65,000 TPA) & Sinter plant (1,65,000 TPA), EAF (52,800 TPA Low Carbon Fe-Cr) & MRP, Rolling Mill (3,96,000 TPA) & 80 MW Captive Power Plant (40 MW WHRB & 40 MW CFBC) is a proposed industrial project in Jambani, Mejhia, Bankura, West Bengal. The site covers 185.1 acres. Its stated project cost is ₹1,025 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 16 Dec 2025).

See it on the live map All projects in Bankura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated Steel plant: Sponge Iron (4,29,000 TPA), SMS with LRF, CCM & MRP (4,12,500 TPA), SAF (max.1,07,136 TPA) {71,424 TPA Si-Mn/ 97,029 TPA Fe-Mn/ 32,141 TPA Fe-Si/ 67,665 TPA Fe-Cr/ 44,332 TPA Fe-Si-Cr/ 1,07,136 TPA Pig Iron or combination of any) including Briquetting plant (1,65,000 TPA) & Sinter plant (1,65,000 TPA), EAF (52,800 TPA Low Carbon Fe-Cr) & MRP, Rolling Mill (3,96,000 TPA) & 80 MW Captive Power Plant (40 MW WHRB & 40 MW CFBC) is a proposed industrial project in Jambani, Mejhia, Bankura, West Bengal. The site covers 185.1 acres.

Who is building it?

The applicant is Dsmt Rolling Mills Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Jambani, Mejhia, Bankura, West Bengal.

How big is it?

It has a stated cost of ₹1,025 crore and a site of 185.1 acres.

When was it filed?

The application was filed on 26 Nov 2025.

Project details

StatusReturned to applicant
Status since16 Dec 2025
Application filed26 Nov 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantDsmt Rolling Mills Private Limited
Land area185.1 acres (74.9 ha)
Project cost₹1,025 crore
Village / localityJambani
Taluk / tehsilMejhia
DistrictBankura
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01435

In context

69 applications in Bankura since January 2022 are in the same category (Industry): 29 approved, 23 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 185.1 acres, this one is larger than 97% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jambani, Mejhia, Bankura, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dsmt Rolling Mills Private Limited in Bankura

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.