What is Developing? Open the mapMap

Initial checksIndustry · Paschim Bardhaman, West Bengal

Upgradation of Billet Casters

Upgradation of Billet Casters is a proposed industrial project in Arjjunpur, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The site covers 1,482.6 acres. Its stated project cost is ₹858.2 crore. As of 27 Nov 2026, its status is “Initial checks” (since 26 Aug 2025).

See it on the live map All projects in Paschim Bardhaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleUpgradation of Billet Casters along with other associated facilities from 1.1 MTPA to 1.8 MTPA with no increase in Crude Steel Production Capacity of Durgapur Steel Plant, Steel Authority of India Limited (SAIL)
StatusInitial checks
Status since26 Aug 2025
Application filed26 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantSteel Authority of India LTD
Land area1,482.6 acres (600 ha)
Project cost₹858.2 crore
Village / localityArjjunpur
Taluk / tehsilFaridpur Durgapur
DistrictPaschim Bardhaman
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01495

In context

169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,482.6 acres, this one is larger than 96% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Arjjunpur, Faridpur Durgapur, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Steel Authority of India LTD in Paschim Bardhaman

9 Steel Authority of India projects in Paschim Bardhaman
All 51 Steel Authority of India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.