What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · South Twenty Four Pargana, West Bengal

Phase-I Expansion within the Existing Campus Consisting of New Academic Block 1 , New Hostel Block H1 , Food Court , Covered Walkway , New Classroom Block - NCB Extension Of MDC , New Service Block-A & Temporary Dog Kennel of Indian Institute Of Management – Calcutta, Joka, Kolkata, West-Bengal

Phase-I Expansion within the Existing Campus Consisting of New Academic Block 1 , New Hostel Block H1 , Food Court , Covered Walkway , New Classroom Block - NCB Extension Of MDC , New Service Block-A & Temporary Dog Kennel of Indian Institute Of Management – Calcutta, Joka, Kolkata, West-Bengal is an approved education project in Daulatpur, Bishnupur - I, South Twenty Four Pargana, West Bengal. It plans 7 towers of up to 10 floors on 134.8 acres. Its stated project cost is ₹518.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 29 Sept 2026).

See it on the live map All projects in South Twenty Four Pargana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since29 Sept 2026
Application filed24 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantIndian Institute of Management Calcutta
UseEducation
Towers7
Floors (tallest)10
Basements1
Height41 m
Parking spaces600
Land area134.8 acres (54.5 ha)
Built-up area1,12,315 m² (12,08,947 sq ft)
Plot area5,45,396 m² (58,70,588 sq ft)
Project cost₹518.5 crore
Village / localityDaulatpur
Taluk / tehsilBishnupur - I
DistrictSouth Twenty Four Pargana
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-01715

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Apr 2026 (this page)Environmental approval granted134.8 acres₹518.5 crore
Early planning filed 21 Nov 2024Cleared for impact study134.8 acres₹518.5 crore

In context

43 applications in South Twenty Four Pargana since January 2022 are in the same category (Buildings & townships): 30 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 134.8 acres, this one is larger than 93% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Daulatpur, Bishnupur - I, South Twenty Four Pargana, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.