Quick answers
What is this project?
Greenfield Steel Plant-Pellet Plant-12,00,000 TPA, Sponge Iron-10,89,000 TPA, Hot Billets/Ingots through IF-5,23,000 TPA & through EAF- 2,67,000 TPA, Merchant Rolling Mill -Structure- Light/Heavy, Pipes- ERW/GI Pipe/Seamless, TMT, Wire Rod, Round- with RHF of 4,95,000 TPA, PGP for Pellet plant & Rolling mill-5 x 6500 Nm3/hr, SEAFs of 4 x 9 MVA (FeSi/ FeMn/SiMn/FeCr/Pig Iron), Briquetting Plant of 200 kg/hr, WHRB–105 MW,FBC–40 MW, Forging Plant of 50,000TPA,Fly Ash Brick (72,000 Bricks/Day) is a proposed industrial project in Durmut, Raghunathpur - I, Puruliya, West Bengal. The site covers 810.6 acres.
Who is building it?
The applicant is Nakshit Iron & Steel Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Jul 2026), as of 27 Nov 2026.
Where is it?
In Durmut, Raghunathpur - I, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹3,600 crore and a site of 810.6 acres.
When was it filed?
The application was filed on 5 Feb 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Steel Plant-Pellet Plant-12,00,000 TPA, Sponge Iron-10,89,000 TPA, Hot…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Jul 2026 |
| Application filed | 5 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nakshit Iron & Steel Private Limited |
| Land area | 810.6 acres (328 ha) |
| Project cost | ₹3,600 crore |
| Village / locality | Durmut |
| Taluk / tehsil | Raghunathpur - I |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01736 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2026 | Environmental approval granted | 810.6 acres | ₹3,600 crore |
| Early planning filed 5 Feb 2026 (this page) | Cleared for impact study | 810.6 acres | ₹3,600 crore |
In context
33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 810.6 acres, this one is larger than 82% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Durmut, Raghunathpur - I, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Steel Plant-Pellet Plant-12,00,000 TPA, Sponge Iron-10,89,000 TPA,… — environmental approval granted, 0 m away
- Palsara Black Stone Mine-Iii — environmental approval granted, 3.7 km away
- Jinamanipur Fireclay Mine — lapsed, 4.8 km away
- Kashipur Black Stone Mine — environmental approval granted, 5.6 km away
- Kashipur Riverbed Sand Mine (MIN_PUR_19) — more information requested, 6.1 km away
- Kashipur Sand Mine (MIN_PUR_11) — environmental approval granted, 6.4 km away
- Kashipur Sand Mine (MIN_PUR_20) — environmental approval granted, 6.9 km away