Quick answers
What is this project?
Greenfield Steel Plant for Production of 1.7 MTPA Pellets, 1.320 MTPA Sponge Iron, 0.66MTPA MS Steel/Stainless Steel Billets, 0.627 MTPA MS/SS Rolled Products, 0.0528MTPA Grinding Media Ball, 0.1607 MTPA Pig Iron or 0.1455 MTPA Ferro Alloys, 0.0528 MTPA LCFC and 165 MW Captive Power Plant is a proposed industrial project in Haridi, Neturia, Puruliya, West Bengal. The site covers 803.7 acres.
Who is building it?
The applicant is DSMT Steel & Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Haridi, Neturia, Puruliya, West Bengal.
How big is it?
It has a stated cost of ₹1,846 crore and a site of 803.7 acres.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Official title | Establishment of Greenfield Steel Plant for Production of 1.7 MTPA Pellets, 1.320 MTPA Sponge Iron, 0.66MTPA MS Steel/Stainless Steel Billets, 0.627 MTPA MS/SS Rolled Products, 0.0528MTPA Grinding Media Ball, 0.1607 MTPA Pig Iron or 0.1455 MTPA Ferro Alloys, 0.0528 MTPA LCFC and 165 MW Captive Power Plant along with allied facilities by DSMT Steel & Energy Private Limited at Village - Haridi, PO- Ramkanali, PS-Neturia, Dist.-Purulia, West Bengal |
|---|---|
| Status | Under environmental review |
| Status since | 30 Jul 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | DSMT Steel & Energy Private Limited |
| Land area | 803.7 acres (325.3 ha) |
| Project cost | ₹1,846 crore |
| Village / locality | Haridi |
| Taluk / tehsil | Neturia |
| District | Puruliya |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01899 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 3 Jul 2026 (this page) | Under environmental review | 803.7 acres | ₹1,846 crore |
| Early planning filed 2 Dec 2025 | Returned to applicant | 220.3 acres | ₹1,846 crore |
In context
33 applications in Puruliya since January 2022 are in the same category (Industry): 22 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 803.7 acres, this one is larger than 79% of them.
Where it is
Haridi, Neturia, Puruliya, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manbazar - I Sand Mine (MIN_PUR_37) — environmental approval granted, 11.6 km away
- Manbazar - I Sand Mine (MIN_PUR_35) — environmental approval granted, 12.3 km away
- Manbazar - I Sand Mine (MIN_PUR_36) — environmental approval granted, 12.8 km away
- Manbazar - I Sand Mine (MIN_PUR_38) — environmental approval granted, 15.5 km away
- Kendajore Blackstone Mine — environmental approval granted, 17.2 km away
- Kendajore Quartz Mine — initial checks, 17.5 km away
- Reconnaissance Survey for Graphite in Korapara Area, purulia, West Bengal — forest land use approved, 25.2 km away
- Metayala Quartz Mine — lapsed, 26.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.