One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposal of Diversion of 0.3998 Ha of forest land at Senchal Wildlife Sanctuary along…
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2026 |
| Application filed | 16 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Limited |
| Land area | 2.5 acres (1 ha) |
| Forest land | 4,000 m² |
| Project cost | ₹30 lakh |
| Village / locality | Sonada Forest |
| Taluk / tehsil | Jorebunglow Sukiapokhri |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02062 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 May 2023 | Under wildlife review | 2.5 acres | ₹30 lakh |
| New project filed 16 Feb 2023 (this page) | Lapsed | 2.5 acres | ₹30 lakh |
In context
20 applications in Darjiling since January 2022 are in the same category (Telecom): 5 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 2.5 acres, this one is larger than 84% of them.
49 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sonada Forest, Jorebunglow Sukiapokhri, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of Diversion of 0.3998 Ha of forest land at Senchal Wildlife… — under wildlife review, 0 m away
- Source and Construction of Open Ground Water Reservoir of Capacity 20 Ml at… — lapsed, 1.1 km away
- Source and Construction of Open Ground Water Reservoir of Capacity 20 Ml at… — more information requested, 1.1 km away
- Gravity Based Water Supply Scheme for Alubari Under Jal Jeewan Mission — forest land use approved, 1.3 km away
- Gravity Based Water Supply Scheme for Alubari Under Jal Jeewan Mission — decision issued, 1.3 km away
- Gravity Based Water Supply Scheme for Sonada Forest under JJM — decision issued, 1.5 km away
- Water Supply Scheme For Ghoom Pahar Forest under JAL JEEWAN MISSION within… — forest land use approved, 1.5 km away
- Water Supply Scheme For Ghoom Pahar Forest under JAL JEEWAN MISSION within… — decision issued, 1.5 km away
More from Reliance Jio Infocomm Limited in Darjiling
- THE PROPOSED ROUTE OF OFC CABLE FROM TIN MILE TO RANGBULL TIN MILE ALONG… — more information requested
- THE PROPOSED ROUTE OF OFC CABLE FROM TIN MILE TO RANGBULL TIN MILE ALONG… — lapsed
- Laying Ofc for Connecting Tower No I-Wb-Jbpb-Enb-9038 Through Forest Areas… — lapsed
- Laying Ofc From Lat Long(27.01189/ 88.29840 ) to Lat Long(27.00442/ 88.28587 )… — lapsed
- Laying Ofc From Lat Long(27.01189/ 88.29840 ) to Lat Long(27.00442/ 88.28587 )… — under wildlife review
- Laying Ofc From Sevoke Rail Gate to Kalijhora Village Within Row of NH-10… — under wildlife review
16 Reliance Jio Infocomm (Jio) projects in Darjiling
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.