Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram District (Model Stand Alone Grid Power Operated Water Supply System For Habitations / Mouzas With 400 & More Population) Under Mid-Term Plan Of Master Plan.

Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram District (Model Stand Alone Grid Power Operated Water Supply System For Habitations / Mouzas With 400 & More Population) Under Mid-Term Plan Of Master Plan is a lapsed water and irrigation project in Jamui, Jamboni, Jhargram, West Bengal. The site covers 353.4 acres. Its stated project cost is ₹6 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 6 Aug 2025).

See it on the live map All projects in Jhargram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram District (Model Stand Alone Grid Power Operated Water Supply System For Habitations / Mouzas With 400 & More Population) Under Mid-Term Plan Of Master Plan is a lapsed water and irrigation project in Jamui, Jamboni, Jhargram, West Bengal. The site covers 353.4 acres.

Who is building it?

The applicant is Rural Development.

Has it been approved?

No. The application was lapsed on 6 Aug 2025, so it is no longer under consideration.

Where is it?

In Jamui, Jamboni, Jhargram, West Bengal.

How big is it?

It has a stated cost of ₹6 lakh; a site of 353.4 acres and 190 m² of forest land.

When was it filed?

The application was filed on 2 Dec 2024.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram District…

Project details

StatusLapsed
Status since6 Aug 2025
Application filed2 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantRural Development
Land area353.4 acres (143 ha)
Forest land190 m²
Project cost₹6 lakh
Village / localityJamui
Taluk / tehsilJamboni
DistrictJhargram
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-02100

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 6 Nov 2025Lapsed353.4 acres₹6 lakh
New project filed 2 Dec 2024 (this page)Lapsed353.4 acres₹6 lakh
New project filed 22 Jan 2024Lapsed353.4 acres₹6 lakh

In context

45 applications in Jhargram since January 2022 are in the same category (Water & irrigation): 0 approved, 0 filed or under review, and 45 withdrawn, lapsed or rejected. At 353.4 acres, this one is smaller than 62% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jamui, Jamboni, Jhargram, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rural Development in Jhargram

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.