Project details
| Official title | Water Supply Scheme for Soureni Basti Piped Water Supply Scheme in Mirik Block Under Darjeeling District |
|---|---|
| Status | Forest land use approved |
| Status since | 28 Jul 2025 |
| Application filed | 17 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Mani Mangrati |
| Land area | 100 m² |
| Forest land | 300 m² |
| Project cost | ₹1.8 crore |
| Village / locality | Okaity Tea Estate |
| Taluk / tehsil | Mirik |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02128 |
In context
97 applications in Darjiling since January 2022 are in the same category (Water & irrigation): 25 approved, 32 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Okaity Tea Estate, Mirik, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme for Soureni Tea Estate Piped Water Supply Scheme — lapsed, 350 m away
- Piped Water Supply Schemes — lapsed, 3.2 km away
- Balason Hydro Electric Power (38 MW) West Bengal — cleared for impact study, 4.4 km away
- Proposal of Laying Ofc From Shukiapokhri to Mirik Through Forest Areas of… — forest land use approved, 6.6 km away
- Pipe Water Supply Scheme for Lohagarh Within Kurseong Block Under District… — more information requested, 7.8 km away
- Surface Water Based Patong Tea Garden Piped Water Supply Scheme to Accomodate… — more information requested, 8.6 km away
- New Bridge across the river Balason at 5.70 Km of Garidhura-Mirik Simanabusty… — forest land use approved, 9 km away
- Water Supply Scheme under Amrut 2.0 within Kurseong Municipality — more information requested, 9.8 km away
More from Mani Mangrati in Darjiling
- Additional Work for Surface Water Based for Mangpuu Cinchona Plantation Piped… — more information requested
- Additional Work for Surface Water Based for Mangpuu Cinchona Plantation Piped… — lapsed
- Water Supply Scheme for Ghoom Pahar Forest Piped Water Supply Scheme in… — lapsed
- Water Supply Scheme for Pussinbong Piped Water Supply Scheme in Jorebunglow… — lapsed
- Piped water supply for Sevoke Forest. Kurseong PHED — lapsed
- Water Supply Scheme for Sittong Khasmal Piped Water Supply Scheme Kurseong… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.