Project details
| Status | More information requested |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 7 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 800 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Maraghat Forest |
| Taluk / tehsil | Dhupguri |
| District | Jalpaiguri |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02144 |
In context
15 applications in Jalpaiguri since January 2022 are in the same category (Telecom): 9 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2.7 years from filing to approval. At 0.2 acres, this one is smaller than 57% of them.
Where it is
Maraghat Forest, Dhupguri, Jalpaiguri, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — application filed, 9.6 km away
- Diversion of Forest for use as Road at Tollgate Beat under Diana Range,… — lapsed, 12.2 km away
- De-silting/dredging/removal of River Bed Materials from Daina River at Nagrakata — lapsed, 12.6 km away
- Betgara Sand Mine (MIN_JPG_14) — environmental approval granted, 13.4 km away
- Dhaolaguri Sand Mine (MIN_JPG_15) — environmental approval granted, 13.4 km away
- Char Churabhandar Sand Mine (MIN_JPG_16) — environmental approval granted, 14.2 km away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — more information requested, 15.5 km away
- Proposed Synthetic Resin Production Plant (PF Resin & MUF Resin) by M/s East… — cleared for impact study, 18.6 km away
More from Mahesh Nair in Jalpaiguri
- 4G Saturation Project in uncovered village Mechbasti — forest land use approved
- 4g Saturation Project in Uncovered Village Sologhoria — forest land use approved
- 4G Saturation Project in uncovered village Panjhora. — forest land use approved
- 4G Saturation Project in uncovered village Sipchu. — forest land use approved
- 4g Saturation Project in Uncovered Village Bichabhanga — forest land use approved
- 4G Saturation Project in uncovered village Panjhora. — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.