Project details
| Official title | Construction of Fire station at Algarah under Santook Gram, Panchayat under Lava Block Dist: kalimpong |
|---|---|
| Status | More information requested |
| Status since | 28 Apr 2026 |
| Application filed | 25 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Divisional Fire Officer, Kalimpong Division |
| Land area | 3.6 acres (1.4 ha) |
| Forest land | 2,040 m² |
| Project cost | ₹7.5 crore |
| Village / locality | Paiengaon Khasmahal |
| Taluk / tehsil | Kalimpong - Ii |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02225 |
In context
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paiengaon Khasmahal, Kalimpong - Ii, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of 0.204ha of Forest Land for Construction of Fire Station at… — lapsed, 100 m away
- Diversion of 1.92 Ha of Forest Land in Favour of 764,brtf for Widening of… — lapsed, 850 m away
- Diversion of forest land measuring 0.6400 Ha for construction of IP Station… — lapsed, 1.3 km away
- Proposed 0.0148 Ha land to be acquire for Piped Water Supply Scheme from 9th… — lapsed, 1.5 km away
- Pre-Construction Activities in Respect of "widening and Up- Gradation of… — more information requested, 3.5 km away
- Proposed Diversion of 0.0109 Hectares of Forest Land Under Jal Jeevan Mission… — forest land use approved, 3.7 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 16th… — lapsed, 4.1 km away
- Proposed 0.0486 Ha Land to Be Diverted for Gravity Based and Pumping Based… — more information requested, 4.8 km away
More from Divisional Fire Officer, Kalimpong Division in Kalimpong
- Fire station at Jholung under Patek Godak GP, under Gurubathan Block Dist:… — lapsed
- The Diversion of 0.263ha of Forest Land for Construction of Fire Station at… — lapsed
- The Diversion of 0.204ha of Forest Land for Construction of Fire Station at… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.