Project details
| Status | Under wildlife review |
|---|---|
| Status since | 16 Oct 2024 |
| Application filed | 16 Oct 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Singalila Forest |
| Taluk / tehsil | Darjeeling Pulbazar |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02476 |
In context
20 applications in Darjiling since January 2022 are in the same category (Telecom): 5 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0 acres, this one is smaller than 95% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Singalila Forest, Darjeeling Pulbazar, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Border Out Post of 36th Bn Ssb (Mha) at Tumbling Fatak — under wildlife review, 50 m away
- Border Out Post of 36th Bn Ssb (Mha) at Meghma — more information requested, 2.8 km away
- Border Out Post of 36th Bn Ssb (Mha) at Gairibas — under wildlife review, 3.3 km away
- Proposal for Tower construction under BOP/BIP Project at Garibas camp (36… — more information requested, 3.3 km away
- ADSS OFC Laying of 4.5Km for BOP Meghma- BOP Lameyadhura route to provide… — initial checks, 5.1 km away
- 4g Mobile Tower at KANKIBONG BLOCK, COMPARTMENT-I UNDER DHODREY RANGE — more information requested, 5.4 km away
- Border Out Post of 36th Bn Ssb (Mha) at Batasey — under wildlife review, 5.8 km away
- Proposal for Tower construction under BOP/BIP Project at Batasey Camp (36… — under wildlife review, 5.8 km away
More from Mahesh Nair in Darjiling
- ADSS OFC Laying of 4.5Km for BOP Meghma- BOP Lameyadhura route to provide… — initial checks
- ADSS OFC Laying of 5.88Km for Lameyadhura-Poolkhola route to provide backhaul… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Moley BOP camp (36 BN) — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Batasey Camp (36… — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Kalapokhari BOP camp… — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Garibas camp (36… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.