Blueparrot Pedestal Limited is proposing the construction of a major data centre building project in Dholera village, Dholera sub-district, Ahmadabad district, Gujarat. According to the application documents, the project will cover a plot area of 63.31 hectares (156.44 acres) with a total built-up area of 2,20,243.79 square metres. The estimated cost of the facility is ₹72,500 crore. The project is currently under environmental review, having applied for its Terms of Reference to conduct an environmental impact assessment.
| Item | Detail |
|---|---|
| Applicant | Blueparrot Pedestal Limited |
| Location | Dholera, Ahmadabad, Gujarat |
| Plot Area | 63.31 hectares (156.44 acres) |
| Built-up Area | 2,20,243.79 square metres |
| Estimated Cost | ₹72,500 crore |
| Power Requirement | 813.6 MW |
What is planned
According to the conceptual plan filed with the application, the project will provide dedicated infrastructure for data storage, processing, and networking. The facility will include the main data centre buildings and ancillary structures, a gateway, a guard house, an aboveground water tank, a substation, and an organic waste converter. The built-up area for the data centre and ancillary buildings alone is proposed to be 1,88,630.65 square metres. The applicant plans to install 41 diesel generator sets, each with a capacity of 3500 KVA, strictly for standby purposes.
Where it is and the land
The project is located at Town Planning (TP) 2B3 in the Dholera Special Investment Region (SIR), Gujarat. The total land area is 63.31 hectares (156.44 acres). The conceptual plan notes that the site is bordered by agricultural land to the north and south. The Dholera SIR is 1,250 metres to the east, and the Ahmedabad-Dholera Expressway is 650 metres to the west.
Cost, jobs and schedule
The estimated cost of the project is ₹72,500 crore. The applicant's conceptual plan states that the project will generate a total workforce requirement of 3,450 positions. During the construction phase, employment will peak at 2,300 personnel, including 2,100 temporary or contractual workers and 200 permanent staff. Once operational, the facility will require 760 roles, comprising 700 permanent personnel working across three shifts and 60 temporary workers. The proposed construction schedule is set to begin on December 15, 2026, with completion targeted for November 15, 2029.
Water, power and connectivity
Water for the facility will be sourced from the Dholera Authority Supply. The project will require 813.6 MW of power, which will be supplied by Torrent Power. According to the documents, 51% of the electricity consumed for core data centre operations will be sourced from renewable energy. The site is located 0.66 kilometres from the Ahmedabad-Dholera Express Road and 2.35 kilometres from Dholera town. Dholera Airport is approximately 19 kilometres away, while the Ahmedabad International Airport is 102 kilometres from the site.
Environmental concerns and safeguards
The applicant proposes several environmental safeguards. Treated sewage from a proposed sewage treatment plant will be reused for gardening and dual plumbing within the premises. A rainwater harvesting system with a storage capacity of 625 kilolitres (comprising two 312-kilolitre tanks) is planned to capture roof runoff. The conceptual plan indicates that no trees will be cut for the project, and 4,405 trees will be planted in the recreational ground area. Solid waste generation is estimated at 190 kilograms per day. The facility is also expected to generate 1,734 tonnes per annum (TPA) of e-waste and 1,468 TPA of battery waste, which will be collected and sent to authorized recyclers. The standby diesel generators will be equipped with acoustic enclosures to control noise.
Approvals so far
The project is currently under environmental review. Blueparrot Pedestal Limited filed an application for environmental Terms of Reference on October 21, 2026, to conduct an Environmental Impact Assessment (EIA) study. According to the baseline summary document, the applicant has already collected baseline environmental data within a 10-kilometre radius of the site during the summer season (March to May 2026), monitoring air quality, groundwater from village borewells, surface water from village ponds, and noise levels.
Filings for this project
| Filing | Approval sought | Status | Filed | Status since |
|---|---|---|---|---|
| Data Centre Building project by Blueparrot Pedestal Limited Early planning · Dholera, Dholera, Ahmadabad | Environmental approval | Under environmental review | 21 Oct 2026 | 17 Nov 2026 |