In depth: Blueparrot Data Centre: 813 MW Data Centre Building Project in Dholera, Gujarat — every filing for this project and where each stands.
Project details
| Official title | Construction of Data Centre Building project by Blueparrot Pedestal Limited |
|---|---|
| Status | Under environmental review |
| Status since | 17 Nov 2026 |
| Application filed | 21 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Blueparrot Pedestal Limited |
| Land area | 156.4 acres (63.3 ha) |
| Project cost | ₹72,500 crore |
| Village / locality | Dholera |
| Taluk / tehsil | Dholera |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10590 |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 156.4 acres, this one is larger than 97% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dholera, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential & Commercial Building Project namely "Akhilam" by Parjiya… — environmental approval granted, 900 m away
- Semiconductor Wafer Fabrication — environmental approval granted, 1.7 km away
- Semiconductor Wafer Fabrication — environmental approval granted, 1.7 km away
- Expansion of Semiconductor Wafer Fabrication Project — under environmental review, 1.8 km away
- Shantiban Skylar — initial checks, 1.9 km away
- Environment Clearance for proposed Factory Building construction project for… — initial checks, 2.3 km away
- Environment Clearance for proposed Factory Building construction project for… — environmental approval granted, 2.3 km away
- 8" dia. Steel Gas pipeline from End Point of Dhandhuka-Dholera Pipeline Near… — forest land use approved, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.