Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Feb 2024 |
| Application filed | 10 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deputy Commissioner, South Andaman |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹4.4 crore |
| Village / locality | Brookshabad |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00004 |
In context
7 applications in South Andaman since January 2022 are in the same category (Mining): 7 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Brookshabad, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brookshabad Stone Quarry for A-Block (Non-Explosive) — environmental approval granted, 300 m away
- Proposed redevelopment of existing Megapode Hotel Resort at Sri Vijaya Puram,… — coastal clearance granted, 6.1 km away
- Proposed development of Netaji Subhas Chandra Bose (NSCB) Island — under coastal review, 6.2 km away
- Proposed development of Viper Island — lapsed, 6.4 km away
- Temporary Tourism Facilities Shacks, Toilets, Change Rooms, Walk Ways… — lapsed, 7.8 km away
- 57.105 MW Single Fuel (LNG) based Power Project at Hope Town (V), Ferrargunj… — under environmental review, 8.2 km away
- Gas Supply Infrastructure for Power Project at Sri Vijayapuram, Hopetown — lapsed, 8.2 km away
- Gas Supply Infrastructure for Power Project at Sri Vijayapuram, Hopetown — cleared for impact study, 8.2 km away
More from Deputy Commissioner, South Andaman in South Andaman
- HutBay Stone Quarry for Non-Explosive Blocks — environmental approval granted
- Brookshabad Stone Quarry for A-Block (Non-Explosive) — environmental approval granted
- Hut Bay Stone Quarry (Non-Explosive Block) — environmental approval granted
- White Moorum Quarry - 2024 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.