Project details
| Official title | Installation of Temporary Tourism Facilities Shacks, Toilets, Change Rooms, Walk Ways Constructed Using Interlocking Paver Blocks, Drinking Water Facilities, Seating Arrangements Facilities at Revenue Survey No. 96/1, Bimblitang Village |
|---|---|
| Status | Lapsed |
| Status since | 8 May 2026 |
| Application filed | 20 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | G V V D Prasad rao |
| Land area | 3,000 m² |
| Project cost | ₹15 lakh |
| Village / locality | Bimilitan (Rv) & Kodiyaghat |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00113 |
In context
8 applications in South Andaman since January 2022 are in the same category (Buildings & townships): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bimilitan (Rv) & Kodiyaghat, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Supreme Hotel at Survey no. 295, Chidiyatapu, Village-Bimbliton,… — coastal clearance granted, 1.9 km away
- Installation of One 4g Tower in South Andaman — forest land use approved, 5 km away
- Brookshabad Stone Quarry for A-Block (Non-Explosive) — environmental approval granted, 7.6 km away
- Brookshabad Stone Quarry for B-Block (Explosive) — environmental approval granted, 7.8 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 9.5 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 9.5 km away
- Laying of Underground 33 KV HT UG cable from Manjery 2-Pole structure to APWD… — lapsed, 9.5 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — under wildlife review, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.