Quick answers
What is this project?
Diversion of Forest Land for Laying Optical Fibre Cable in Baratang Forest Division is a lapsed telecom project in Adojig (Rv) (Including Efa), Rangat, North & Middle Andaman, Andaman and Nicobar Islands. The site covers 0.1 acres.
Who is building it?
The applicant is Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle.
Has it been approved?
No. The application was lapsed on 1 Dec 2023, so it is no longer under consideration.
Where is it?
In Adojig (Rv) (Including Efa), Rangat, North & Middle Andaman, Andaman and Nicobar Islands.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.1 acres and 600 m² of forest land.
When was it filed?
The application was filed on 30 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land for Laying Optical Fibre Cable in Baratang Forest Division
Project details
| Official title | Proposal for Diversion of Forest Land for Laying Optical Fibre Cable in Baratang Forest Division Under Usof Project |
|---|---|
| Status | Lapsed |
| Status since | 1 Dec 2023 |
| Application filed | 30 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle |
| Land area | 600 m² |
| Forest land | 600 m² |
| Project cost | ₹10 lakh |
| Village / locality | Adojig (Rv) (Including Efa) |
| Taluk / tehsil | Rangat |
| District | North & Middle Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00077 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Nov 2023 (this page) | Lapsed | 0.1 acres | ₹10 lakh |
| Change of use filed 30 Nov 2023 | Forest land use approved | 0.1 acres | ₹10 lakh |
In context
16 applications in North & Middle Andaman since January 2022 are in the same category (Telecom): 6 approved, 1 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.1 acres, this one is smaller than 80% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adojig (Rv) (Including Efa), Rangat, North & Middle Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying Optical Fibre Cable in Baratang Forest… — forest land use approved, 0 m away
- Baratang — lapsed, 700 m away
- Diversion of 0.2207 Ha Forest Land for Construction of Two Minor Bridges in… — forest land use approved, 1.4 km away
- Optical Fibre Laying in between Middle Strait to Baratang Jetty — coastal clearance granted, 8.5 km away
- USOF Project for 4G Mobile Coverage in Uncovered Villages and NH in Andaman &… — lapsed, 14 km away
- Installation of One 4G Tower in Strait Island under USOF Project — forest land use approved, 14 km away
- 4g Saturation Project in Andaman and Nicobar Islands — forest land use approved, 15.5 km away
- Extension of jetty by 150m x 20m and 8 Navigational aids at Long Island in… — coastal clearance granted, 19.9 km away
More from Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle in North & Middle Andaman
- Optical Fibre Laying in between Middle Strait to Baratang Jetty — coastal clearance granted
- Diversion of forest land for laying of Optical Fibre Cable from Kishori Nagar… — lapsed
- Proposal to Divert 0.4707 Ha of Forest Land for Laying a 26.49 Km Ofc Cable in… — forest land use approved
- Three (3) 4G towers in Mayabunder Forest Division — forest land use approved
- Diversion of Forest Land for Laying Optical Fibre Cable in Mayabunder Forest… — forest land use approved