Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach, Swarajdweep, South Andaman

Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach, Swarajdweep, South Andaman is a lapsed telecom project in Havelock Island, Port Blair, South Andaman, Andaman and Nicobar Islands. The site covers 0 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 18 Sept 2024).

See it on the live map All projects in South Andaman

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since18 Sept 2024
Application filed18 Sept 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantMahesh Nair
Land area200 m²
Forest land200 m²
Project cost₹55 lakh
Village / localityHavelock Island
Taluk / tehsilPort Blair
DistrictSouth Andaman
StateAndaman and Nicobar Islands
Location fromSite boundary on record
Our referenceWID-AN-00085

In context

11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Havelock Island, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mahesh Nair in South Andaman

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.