| Status | Lapsed |
|---|---|
| Status since | 18 Sept 2024 |
| Application filed | 18 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹55 lakh |
| Village / locality | Havelock Island |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00085 |
In context
11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Havelock Island, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted, 50 m away
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending, 50 m away
- Providing and Laying GI Pipe from Elephant beach forest inside Hill to… — lapsed, 750 m away
- "Proposed Renewable Energy Power Plant (0.4 MW Solar PV) at 'Taj Exotica… — under coastal review, 2.9 km away
- Eco friendly Resort at Govind Nagar, Swaraj Dweep (Havelock) Island, Andaman &… — more information requested, 5.2 km away
- Development of Water Aerodrome at Swaraj Island, Andaman & Nicobar — environmental approval granted, 5.4 km away
- Seaport terminal at Shaheed Dweep (Neil Island) in Andaman & Nicobar Islands — coastal clearance granted, 21.2 km away
- 1.3MW ground based Solar Photovoltaic (PV) Power Plant — under coastal review, 21.6 km away
More from Mahesh Nair in South Andaman
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed
- 4g Saturation Project in Andaman and Nicobar — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.