Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 May 2024 |
| Application filed | 22 Dec 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Mahesh Nair |
| Land area | 1,400 m² |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹256 crore |
| Village / locality | Shoal Bay |
| Taluk / tehsil | Ferrargunj |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site area on record |
| Our reference | WID-AN-00083 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 22 Dec 2023 (this page) | Forest land use approved | 0.3 acres | ₹256 crore |
| New project filed 2 Nov 2023 | Lapsed | 0.3 acres | ₹256 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shoal Bay, Ferrargunj, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed, 0 m away
- Check Weir, Pump house, Pipeline & 01 No. CWR (2.45 Lakh) at Shoalbay-14 under… — in-principle approval, conditions pending, 2.4 km away
- Check Weir, Pump house and pipeline & 01 No. CWR (2.45 Lakh) at Shoal Bay-11… — in-principle approval, conditions pending, 3.9 km away
- Installation of 4G Tower in South Andaman under USOF Project — lapsed, 7.8 km away
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved, 14.6 km away
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved, 15.9 km away
- 60MW Floating Solar Photovoltaic (PV) Power Plant — under coastal review, 17.3 km away
- 04-Lane Major Bridge for Connectivity of Sri Vijaya Puram (Earlier Known As… — lapsed, 19.5 km away
More from Mahesh Nair in South Andaman
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending
- Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach,… — lapsed
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed
- 4g Saturation Project in Andaman and Nicobar — forest land use approved
- 4g Saturation Project in Andaman and Nicobar Islands — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.