Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 9 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | New & Renewable Energy Development Corporation of Andhra Pradesh Limited |
| Land area | 177.9 acres (72 ha) |
| Project cost | ₹6,965.7 crore |
| Village / locality | Rf |
| Taluk / tehsil | Vempalle |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00289 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Nov 2023 | Lapsed | 177.9 acres | ₹6,965.7 crore |
| Early planning filed 9 May 2023 (this page) | Cleared for impact study | 177.9 acres | ₹6,965.7 crore |
In context
13 applications in Y.S.R. since January 2022 are in the same category (Water & irrigation): 9 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 177.9 acres, this one is smaller than 85% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Vempalle, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vempalli Pumped Storage Hydro Electric Project — lapsed, 0 m away
- Vempalli PSP (1500 MW)-Request for Issue of Permission for Geo-Technical… — more information requested, 1.3 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — lapsed, 4.8 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — more information requested, 5 km away
- C venkata Ramana Baryte Mine-6.070 Ha — environmental approval granted, 6.7 km away
- Mining project by M/s Ashok Minerals — environmental approval granted, 7 km away
- Vpr Mining Infrastructure Pvtlimited - 17.362 — environmental approval granted, 7.3 km away
- Quartz mine production @ 10,80,000 TPA by Dr. S. Ravindranath Reddy — environmental approval granted, 7.4 km away
More from New & Renewable Energy Development Corporation of Andhra Pradesh Limited in Y.S.R.
- Gandikota Pumped Storage Project — under forest review
- Gandikota Pumped Storage Project (1000 MW) — environmental approval granted
- Chitravathi Pumped Storage Hydro-Electric Project Sri Sathya Sai District of… — environmental approval granted
- Vempalli PSP (1500 MW)-Request for Issue of Permission for Geo-Technical… — more information requested
- Drilling of 06Nos. bore holes in compartment no.8&9 of Malmmidi kambaldinne… — forest land use approved
- Somasila Pumped Storage Hydroelectric Project-900 MW — lapsed
17 New & Renewable Energy Development Corporation of Andhra Pradesh projects in Y.S.R.
All 32 New & Renewable Energy Development Corporation of Andhra Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.