Project details
| Status | More information requested |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 31 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | New & Renewable Energy Development Corporation of Andhra Pradesh Limited |
| Land area | 2,131.4 acres (862.5 ha) |
| Forest land | 2,131.4 acres (862.5 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Rf |
| Taluk / tehsil | Vempalle |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04662 |
In context
16 applications in Y.S.R. since January 2022 are in the same category (Other): 2 approved, 8 filed or under review, and 6 withdrawn, lapsed or rejected. At 2,131.4 acres, this one is larger than 69% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Vempalle, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vempalli Pumped Storage Hydro Electric Project — lapsed, 1.3 km away
- Vempalli Pumped Storage Hydro Electric Project — cleared for impact study, 1.3 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — lapsed, 3.8 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — more information requested, 3.9 km away
- Quartz mine production @ 10,80,000 TPA by Dr. S. Ravindranath Reddy — environmental approval granted, 6.5 km away
- Marellamadaka River Sand Reach — environmental approval granted, 7.3 km away
- Marellamadaka-II Open Sand Reach — environmental approval granted, 7.6 km away
- Gandikovvuru Sand Reach — cleared for impact study, 7.7 km away
More from New & Renewable Energy Development Corporation of Andhra Pradesh Limited in Y.S.R.
- Gandikota Pumped Storage Project — under forest review
- Gandikota Pumped Storage Project (1000 MW) — environmental approval granted
- Chitravathi Pumped Storage Hydro-Electric Project Sri Sathya Sai District of… — environmental approval granted
- Drilling of 06Nos. bore holes in compartment no.8&9 of Malmmidi kambaldinne… — forest land use approved
- Somasila Pumped Storage Hydroelectric Project-900 MW — lapsed
- Vempalli Pumped Storage Hydro Electric Project — lapsed
17 New & Renewable Energy Development Corporation of Andhra Pradesh projects in Y.S.R.
All 32 New & Renewable Energy Development Corporation of Andhra Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.