Quick answers
What is this project?
This proposed mining project by M/s. Murali Krishna Stone Crusher 0.870 ha. is in Pedda Sankarlapudi, Prathipadu, Kakinada, Andhra Pradesh. The site covers 2.1 acres.
Who is building it?
The applicant is Chandravathi Thota.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jan 2023), as of 27 Nov 2026.
Where is it?
In Pedda Sankarlapudi, Prathipadu, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.1 acres.
When was it filed?
The application was filed on 24 Jan 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chandravathi Thota |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Pedda Sankarlapudi |
| Taluk / tehsil | Prathipadu |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00372 |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 97% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Pedda Sankarlapudi, Prathipadu, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ch. Suryanarayana — lapsed, 100 m away
- Sri Ch.Lakshmana Rao — lapsed, 300 m away
- Mining project by M/s. Murali Krishna Stone Crusher — cleared for impact study, 750 m away
- Murali Krishna Stone Crusher — lapsed, 750 m away
- Sri Karnidi Rama Krishna — initial checks, 1.1 km away
- Proposed Laterite Mine : A. Sujatha — more information requested, 3.3 km away
- Sri. P. Raja Ganesh Rayudu, was applied for grant of quarry lease for Laterite… — lapsed, 3.6 km away
- Mining project by M/S Hill Rock Minerals, Mg.P: Sri Bodireddy Gopala Krishna — cleared for impact study, 10.2 km away
More from Chandravathi Thota in Kakinada
- Mining project by M/s. Murali Krishna Stone Crusher — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.