Quick answers
What is this project?
Sri. P. Raja Ganesh Rayudu, was applied for grant of quarry lease for Laterite over an extent of 1.015 Hectares (2.51 Acres) In Sy. No. 24/4P of Vanthada (V), Prathipadu (M), Kakinada District is a lapsed mining project in Vantada, Prathipadu, Kakinada, Andhra Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is P Raja Ganesh Rayudu.
Has it been approved?
No. The application was lapsed on 21 Dec 2025, so it is no longer under consideration.
Where is it?
In Vantada, Prathipadu, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 8 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Dec 2025 |
| Application filed | 8 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | P Raja Ganesh Rayudu |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Vantada |
| Taluk / tehsil | Prathipadu |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02194 |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Vantada, Prathipadu, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Laterite Mine : A. Sujatha — more information requested, 550 m away
- Mining project by M/s. Murali Krishna Stone Crusher 0.870 ha. — cleared for impact study, 3.6 km away
- Ch. Suryanarayana — lapsed, 3.6 km away
- Sri Ch.Lakshmana Rao — lapsed, 3.8 km away
- Murali Krishna Stone Crusher — lapsed, 3.9 km away
- Mining project by M/s. Murali Krishna Stone Crusher — cleared for impact study, 3.9 km away
- Sri Karnidi Rama Krishna — initial checks, 4 km away
- Mining project by M/S Hill Rock Minerals, Mg.P: Sri Bodireddy Gopala Krishna — cleared for impact study, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.