Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Aug 2023 |
| Application filed | 18 May 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Sagar Cements Limited |
| Land area | 1,123.3 acres (454.6 ha) |
| Project cost | ₹10 crore |
| Village / locality | Gudipadu |
| Taluk / tehsil | Yadiki |
| District | Anantpur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00596 |
In context
223 applications in Anantpur since January 2022 are in the same category (Mining): 158 approved, 23 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,123.3 acres, this one is larger than 98% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 3,369.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Gudipadu, Yadiki, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance for Extension of the time period for… — environmental approval granted, 50 m away
- Amendment in Environmental Clearance for Extension of the Time Period for… — returned to applicant, 50 m away
- Environmental Clearance for the Amalgamated Gudipadu Limestone Mine of M/s.… — lapsed, 2.1 km away
- Sri A. Mahesh Kumar Reddy, Quarry lease over an extent of 4.674 Ha — under environmental review, 4.3 km away
- Kamalapadu Pumped Storage Hydro Project (950 MW) — cleared for impact study, 5.7 km away
- Kamalapadu Pumped Storage Hydro Project (950 MW) — cleared for impact study, 5.7 km away
- Kamalapadu Closed Loop Pumped Storage Hydro Project — environmental approval granted, 6.1 km away
- As Per Requirement of Eia Notification, 2006 [as Amended to the Date] This Is… — initial checks, 10.2 km away
More from Sagar Cements Limited in Anantpur
- Amendment in Environmental Clearance for Extension of the time period for… — environmental approval granted
- Amendment in Environmental Clearance for Extension of the Time Period for… — returned to applicant
3 Sagar Cements (M) projects in Anantpur
All 22 Sagar Cements (M) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.