Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Apr 2023 |
| Application filed | 10 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Srimannarayana Annapureddy |
| Land area | 11 acres (4.5 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Settivaripalle |
| Taluk / tehsil | S.Mydukur |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00603 |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11 acres, this one is smaller than 66% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 13.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Settivaripalle, S.Mydukur, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Ritwik Projects Private Limited, Authorized Person: Sri… — environmental approval granted, 450 m away
- Sri Venkata Subbaiah Bhumireddy Chinnamandanna Gari — under environmental review, 850 m away
- M/s. Megha Engineering & Infrastructures Ltd - ROAD METAL AND BUILDING STONE -… — lapsed, 3.6 km away
- Widening and Improvement of Existing Two Lanes Carriageway to 4 Lanes of… — forest land use approved, 11.9 km away
- Widening and Improvement of Existing Two Lanes Carriageway to 4 Lanes of… — under wildlife review, 11.9 km away
- Widening And Improvement Of The Existing Two Lanes Carriageway To 4 Lanes Of… — lapsed, 11.9 km away
- Widening and Improvement of the Existing Two Lanes Carriageway to 4 Lanes of… — lapsed, 13.3 km away
- Widening And Improvement Of The Existing Two Lanes Carriageway To 4 Lanes Of… — more information requested, 13.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.