Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Sept 2025 |
| Application filed | 4 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yerragondu Nithyananda Reddy |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Settivaripalle |
| Taluk / tehsil | S.Mydukur |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01807 |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Settivaripalle, S.Mydukur, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Gravel, Morrum and Ordinary Earth — environmental approval granted, 3.6 km away
- Mining project by M/s Ritwik Projects Private Limited, Authorized Person: Sri… — environmental approval granted, 4.1 km away
- Sri Venkata Subbaiah Bhumireddy Chinnamandanna Gari — under environmental review, 4.3 km away
- Widening and Improvement of Existing Two Lanes Carriageway to 4 Lanes of… — forest land use approved, 11.1 km away
- Widening and Improvement of Existing Two Lanes Carriageway to 4 Lanes of… — under wildlife review, 11.1 km away
- Widening And Improvement Of The Existing Two Lanes Carriageway To 4 Lanes Of… — lapsed, 11.1 km away
- Mining project by M/s Mount Vista Private Limited, - 1.00 ha — environmental approval granted, 12 km away
- M/S Dilip Buildcon Limited, Temporary Permit Applied Area for Mining of Road… — environmental approval granted, 12.2 km away
More from Yerragondu Nithyananda Reddy in Y.S.R.
- M/s. Megha Engineering & Infrastructures Ltd, - Road Metal and Building Stone… — lapsed
- M/s. Megha Engineering & Infrastructures Ltd, -Road Metal and Building Stone… — lapsed
- Mining project by M/s. Megha Engineering & Infrastructures Ltd, - 4.900 Ha. — lapsed
- Mining project by M/s. Megha Engineering & Infrastructures Ltd., - 2.000 Ha. — lapsed
- M/S MEGHA ENGINEERING AND INFRASTUCTURES LTD - Road Metal and Building stone — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.