What is Yaganti Pumped Storage Project (1000 MW)?
Yaganti Pumped Storage Project (1000 MW) is a proposed water and irrigation project in Katikavanikunta, Banaganapalle, Nandyal, Andhra Pradesh. The site covers 650.1 acres.
Who is building it?
The applicant is New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Aug 2023), as of 27 Nov 2026.
Where is it?
In Katikavanikunta, Banaganapalle, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹4,252 crore and a site of 650.1 acres.
When was it filed?
The application was filed on 8 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Yaganti Pumped Storage Project (1000 MW)
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 8 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap) |
| Land area | 650.1 acres (263.1 ha) |
| Project cost | ₹4,252 crore |
| Village / locality | Katikavanikunta |
| Taluk / tehsil | Banaganapalle |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-01016 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 20 May 2025 | Cleared for impact study | 650.1 acres | ₹4,252 crore |
| Early planning filed 8 Jun 2023 (this page) | Cleared for impact study | 650.1 acres | ₹4,252 crore |
In context
10 applications in Nandyal since January 2022 are in the same category (Water & irrigation): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 650.1 acres, this one is larger than 60% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Katikavanikunta, Banaganapalle, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Yaganti Pumped Storage Project — cleared for impact study, 550 m away
- Yaganti Pumped Storage Project (1000 MW) — cleared for impact study, 2.1 km away
- Sri C.Ravindranatha Reddy — more information requested, 6.3 km away
- Mine Lease area of 7.754 Ha of C. Ravindranatha Reddy — lapsed, 6.3 km away
- Quarry Lease area of 4.381 Ha in Sy.Nos. 272/1, 272/2, 304/1, 308/1 & 308/2 of… — environmental approval granted, 6.6 km away
- Yellow Ochre Mine — lapsed, 6.6 km away
- 1st Renewal of Quarry Lease for Road Metal over an extent of 2.625 Hectares in… — more information requested, 6.9 km away
- Mining project by M/s GMR Stone Crushers, Prop:Sri.G.Maddilety Reddy, — environmental approval granted, 7.3 km away