Quick answers
What is Yaganti Pumped Storage Project?
Yaganti Pumped Storage Project is a proposed water and irrigation project in Na, Banaganapalle, Nandyal, Andhra Pradesh. The site covers 3,375 acres.
Who is building it?
The applicant is Pandiri Ravindra Reddy.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Oct 2026), as of 27 Nov 2026.
Where is it?
In Na, Banaganapalle, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹10,505 crore and a site of 3,375 acres.
When was it filed?
The application was filed on 7 Aug 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 7 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Pandiri Ravindra Reddy |
| Land area | 3,375 acres (1,365.8 ha) |
| Project cost | ₹10,505 crore |
| Village / locality | Na |
| Taluk / tehsil | Banaganapalle |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03703 |
In context
10 applications in Nandyal since January 2022 are in the same category (Water & irrigation): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 3,375 acres, this one is larger than 90% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Banaganapalle, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Yaganti Pumped Storage Project (1000 MW) — cleared for impact study, 550 m away
- Yaganti Pumped Storage Project (1000 MW) — cleared for impact study, 1.6 km away
- Sri C.Ravindranatha Reddy — more information requested, 6.2 km away
- Mine Lease area of 7.754 Ha of C. Ravindranatha Reddy — lapsed, 6.2 km away
- Quarry Lease area of 4.381 Ha in Sy.Nos. 272/1, 272/2, 304/1, 308/1 & 308/2 of… — environmental approval granted, 6.2 km away
- Yellow Ochre Mine — lapsed, 6.2 km away
- 1st Renewal of Quarry Lease for Road Metal over an extent of 2.625 Hectares in… — more information requested, 6.9 km away
- Mining project by M/s GMR Stone Crushers, Prop:Sri.G.Maddilety Reddy, — environmental approval granted, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.