Quick answers
What is Sri Ponnam Praveen?
Sri Ponnam Praveen is an approved mining project in Chebrolu, Unguturu, Eluru, Andhra Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Praveen Ponnam.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Sept 2023), as of 27 Nov 2026.
Where is it?
In Chebrolu, Unguturu, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 17 Sept 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sri Ponnam Praveen
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Sept 2023 |
| Application filed | 17 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Praveen Ponnam |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Chebrolu |
| Taluk / tehsil | Unguturu |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01089 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Oct 2025 | Environmental approval granted | 4.4 acres | ₹35 lakh |
| New project filed 17 Sept 2023 (this page) | Environmental approval granted | 4.4 acres | ₹35 lakh |
In context
64 applications in Eluru since January 2022 are in the same category (Mining): 42 approved, 9 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.4 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Chebrolu, Unguturu, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Ponnam Praveen — environmental approval granted, 0 m away
- Sri Lakshmi Narayana Raju Patsamatla — lapsed, 2 km away
- SRI LAKSHMI NARAYANA RAJU PATSAMATLA (2.652 Ha) — environmental approval granted, 2 km away
- Proposed HPCL's CBG Plant and 3 KLPD Ethanol Production at Denduluru, Eluru… — lapsed, 18.2 km away
- Proposed HPCL's CBG Plant and 3 KLPD Ethanol Production at Denduluru, Eluru… — lapsed, 18.2 km away
- Smt. Hemalatha Devineni — environmental approval granted, 20.1 km away
- Smt. Hemalatha Devineni — cleared for impact study, 20.1 km away
- Sri M.Venkateswara Rao — environmental approval granted, 20.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.