Quick answers
What is Power project by M/s. Spectrum Power Generation Ltd?
This lapsed power project by M/s. Spectrum Power Generation Ltd is in Komaragiri, Kothapalle, Kakinada, Andhra Pradesh. The site covers 807.3 acres.
Who is building it?
The applicant is Spectrum Power Generation Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Komaragiri, Kothapalle, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹153.4 crore and a site of 807.3 acres.
When was it filed?
The application was filed on 3 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 3 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Power |
| Applicant | Spectrum Power Generation Limited |
| Land area | 807.3 acres (326.7 ha) |
| Project cost | ₹153.4 crore |
| Village / locality | Komaragiri |
| Taluk / tehsil | Kothapalle |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01208 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Komaragiri, Kothapalle, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing 208 MW Gas based Combined Cycle Power Plant — withdrawn, 450 m away
- Project by Sushruta Real Estates Private Limited — lapsed, 4.2 km away
- FSRU based LNG Terminal at Deep Water, Kakinada, District East Godavari,… — returned to applicant, 7.5 km away
- Surrender of Environmental Clearance granted vide Letter No.… — under environmental review, 8.7 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — cleared for impact study, 9.4 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — environmental approval granted, 9.4 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — cleared for impact study, 9.4 km away
- "proposed Product Mix for Production of Tmap/Tdap/Tmkp Through… — initial checks, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.