Quick answers
What is this project?
FSRU based LNG Terminal at Deep Water, Kakinada, District East Godavari, Andhra Pradesh by M/s Andhra Pradesh Gas Distribution Corporation Ltd - Environmental and CRZ Clearance reg is a proposed port and coastal project in Vakalapudi, Kakinada (Rural), Kakinada, Andhra Pradesh. The site covers 53.7 acres.
Who is building it?
The applicant is Andhra Pradesh Gas Distribution Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Vakalapudi, Kakinada (Rural), Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1,800 crore and a site of 53.7 acres.
When was it filed?
The application was filed on 24 Jul 2025.
Project details
| Official title | Development of FSRU based LNG Terminal at Deep Water, Kakinada, District East Godavari, Andhra Pradesh by M/s Andhra Pradesh Gas Distribution Corporation Ltd - Environmental and CRZ Clearance reg. |
|---|---|
| Status | Returned to applicant |
| Status since | 9 Aug 2025 |
| Application filed | 24 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Ports & coast |
| Applicant | Andhra Pradesh Gas Distribution Corporation Limited |
| Land area | 53.7 acres (21.7 ha) |
| Project cost | ₹1,800 crore |
| Village / locality | Vakalapudi |
| Taluk / tehsil | Kakinada (Rural) |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02589 |
In context
10 applications in Kakinada since January 2022 are in the same category (Ports & coast): 7 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 53.7 acres, this one is smaller than 80% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vakalapudi, Kakinada (Rural), Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surrender of Environmental Clearance granted vide Letter No.… — under environmental review, 1.8 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — cleared for impact study, 2.2 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — environmental approval granted, 2.2 km away
- Amalgamation of Environmental Clearances and Amendment/Expansion of Fertilizer… — cleared for impact study, 2.2 km away
- MANUFACTURING OF 93352 MTPA of SUSTAINABLE AVIATION FUEL (93,000 MTPA) AND… — under coastal review, 2.4 km away
- MANUFACTURING OF 93352 MTPA of SUSTAINABLE AVIATION FUEL (93,000 MTPA) AND… — cleared for impact study, 2.4 km away
- "proposed Product Mix for Production of Tmap/Tdap/Tmkp Through… — initial checks, 2.4 km away
- Proposed Product Mix for Production of Tmap/Tdap/Tmkp Through Re-Configuration… — initial checks, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.