What is Developing? Open the mapMap

Cleared for impact studyIndustry · Sri Sathya Sai, Andhra Pradesh

Proposed expansion of integrated paint manufacturing facility at Plot No. 32 (Part) and 35-C/1, APIIC Industrial Park, Sy.No.260 & 272 of Gollapuram, Hindupur, Anantapur, Andhra Pradesh

Proposed expansion of integrated paint manufacturing facility at Plot No. 32 (Part) and 35-C/1, APIIC Industrial Park, Sy.No.260 & 272 of Gollapuram, Hindupur, Anantapur, Andhra Pradesh is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 15.9 acres. Its stated project cost is ₹46.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Nov 2024).

See it on the live map All projects in Sri Sathya Sai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of integrated paint manufacturing facility at Plot No. 32 (Part) and 35-C/1, APIIC Industrial Park, Sy.No.260 & 272 of Gollapuram, Hindupur, Anantapur, Andhra Pradesh is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 15.9 acres.

Who is building it?

The applicant is Gopathi Naresh Babu.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 25 Nov 2024), as of 27 Nov 2026.

Where is it?

In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.

How big is it?

It has a stated cost of ₹46.5 crore and a site of 15.9 acres.

When was it filed?

The application was filed on 20 Nov 2024.

Project details

StatusCleared for impact study
Status since25 Nov 2024
Application filed20 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGopathi Naresh Babu
Land area15.9 acres (6.4 ha)
Project cost₹46.5 crore
Village / localityGollapuram
Taluk / tehsilHindupur
DistrictSri Sathya Sai
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-01303

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 7 Nov 2026Under environmental review15.9 acres₹46.5 crore
Early planning filed 20 Nov 2024 (this page)Cleared for impact study15.9 acres₹46.5 crore

In context

32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.9 acres, this one is larger than 63% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.