Quick answers
What is this project?
Proposed expansion of integrated paint manufacturing facility at Plot No. 32 (Part) and 35-C/1, APIIC Industrial Park, Sy.No.260 & 272 of Gollapuram, Hindupur, Anantapur, Andhra Pradesh is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 15.9 acres.
Who is building it?
The applicant is Gopathi Naresh Babu.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹46.5 crore and a site of 15.9 acres.
When was it filed?
The application was filed on 7 Nov 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of integrated paint manufacturing facility at Plot No. 32 (Part) and…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 7 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Gopathi Naresh Babu |
| Land area | 15.9 acres (6.4 ha) |
| Project cost | ₹46.5 crore |
| Village / locality | Gollapuram |
| Taluk / tehsil | Hindupur |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05285 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Nov 2026 (this page) | Under environmental review | 15.9 acres | ₹46.5 crore |
| Early planning filed 20 Nov 2024 | Cleared for impact study | 15.9 acres | ₹46.5 crore |
In context
32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.9 acres, this one is larger than 63% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of integrated paint manufacturing facility at Plot No. 32… — cleared for impact study, 0 m away
- Industrial project by British Paints (A division of Berger Paints India Ltd) — lapsed, 0 m away
- Industrial project by British Paints (A Division of Berger Paints India Ltd) — returned to applicant, 100 m away
- Addition of new industrial sectors and changes in Existing EC of Proposed… — environmental approval granted, 1.6 km away
- INDUSTRIAL PARK IN AN AREA OF 350 ACRES BY M/s. NEOGEN PROPERTIES PRIVATE… — environmental approval granted, 1.6 km away
- INDUSTRIAL PARK IN AN AREA OF 350 ACRES BY M/s. NEOGEN PROPERTIES PRIVATE… — lapsed, 1.6 km away
- INDUSTRIAL PARK IN AN AREA OF 350 ACRES BY M/s. NEOGEN PROPERTIES PRIVATE… — returned to applicant, 1.6 km away
- INDUSTRIAL PARK IN AN AREA OF 350 ACRES BY M/s. NEOGEN PROPERTIES PRIVATE… — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.