Quick answers
What is this project?
Proposed Expansion in EC, increase in production of M S Billets from 51,250TPA to 1,19,500TPA and TMT Bars/Structural Steel from 50,000TPA to 1,15,000TPA, in the existing area of 5.92 Acres (2.3957Ha), of the Integrated Steel Plant of M/s A-One Steels India Pvt. Ltd., located at Survey No.15, Village Manisamundram, Mandal Hindupur, District Ananthpur, Andhrapradesh is a lapsed industrial project in Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 11.7 acres.
Who is building it?
The applicant is A-One Steels Inida Private Limited.
Has it been approved?
No. The application was lapsed on 4 Aug 2025, so it is no longer under consideration.
Where is it?
In Hindupur, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹39 crore and a site of 11.7 acres.
When was it filed?
The application was filed on 26 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Aug 2025 |
| Application filed | 26 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | A-One Steels Inida Private Limited |
| Land area | 11.7 acres (4.7 ha) |
| Project cost | ₹39 crore |
| Village / locality | Hindupur |
| Taluk / tehsil | Hindupur |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01587 |
In context
32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.7 acres, this one is smaller than 59% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearances (by MoEFCC, letter No.… — environmental approval granted, 0 m away
- Modernization & Modification of Existing 'integrated Steel Plant' by Expansion… — environmental approval granted, 0 m away
- Modernization& Modification of Existing 'Integrated Steel Plant' by Expansion… — lapsed, 0 m away
- Proposed Ordinary Sand Mine in Kodigenahalli Sand Reach of Penna River by M/s.… — environmental approval granted, 4.9 km away
- Mining of Gravel quarry, Sri G. Srinivasulu — environmental approval granted, 9.1 km away
- Diversion of 2.41 ha of Forest Land in Sri Satya Sai Forest Division for… — in-principle approval, conditions pending, 11 km away
- Proposed to establish Bulk Drugs & Drug Intermediates Manufacturing unit by… — under environmental review, 15 km away
- Sri V. Venkatesh — lapsed, 15.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.