Quick answers
What is this project?
Proposed to establish Bulk Drugs & Drug Intermediates Manufacturing unit by M/s. Novagen Life Sciences Pvt. Ltd. with production capacity of 26.0 TPM is a proposed industrial project in Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The site covers 2.1 acres.
Who is building it?
The applicant is Novagen Lifesciences Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹7.5 crore and a site of 2.1 acres.
When was it filed?
The application was filed on 15 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 15 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Novagen Lifesciences Private Limited |
| Land area | 2.1 acres (0.9 ha) |
| Project cost | ₹7.5 crore |
| Village / locality | Gollapuram |
| Taluk / tehsil | Hindupur |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03749 |
In context
32 applications in Sri Sathya Sai since January 2022 are in the same category (Industry): 17 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 94% of them.
30 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gollapuram, Hindupur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Company name in the Environmental Clearance (EC) for Ferro Alloy… — environmental approval granted, 450 m away
- Change of product mix in Noble Ferro Alloy with Maximum Production Capacity of… — initial checks, 650 m away
- Expansion of Ferro Alloys Plant by Addition of 2 X 16.5 MVA SAF with Existing… — cleared for impact study, 650 m away
- Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction… — lapsed, 850 m away
- Proposed Expansion of Existing Steel Plant by Installation of 2x15 T Induction… — returned to applicant, 850 m away
- Transfer of the Environmental Clearance of the Existing Mini-steel Plant from… — lapsed, 900 m away
- Industrial project by M/s. KUBAIR STEEL AND POWER LLP — withdrawn, 900 m away
- Industrial project by M/s. Shyam Ferrous Limited — environmental approval granted, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.