Green field 2 x 100 KLPD Grain based Ethanol Plant with 2 x 2.4 MW Cogeneration power plant is an approved industrial project in Kottapalli Kovuragunta, Dagadarthi, Nellore, Andhra Pradesh. The site covers 28.3 acres.
Who is building it?
The applicant is Fertile Green Industries Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Nov 2024), as of 27 Nov 2026.
Where is it?
In Kottapalli Kovuragunta, Dagadarthi, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹268 crore and a site of 28.3 acres.
When was it filed?
The application was filed on 19 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Nov 2024 |
| Application filed | 19 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Fertile Green Industries Private Limited |
| Land area | 28.3 acres (11.4 ha) |
| Project cost | ₹268 crore |
| Village / locality | Kottapalli Kovuragunta |
| Taluk / tehsil | Dagadarthi |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01650 |
In context
26 applications in Nellore since January 2022 are in the same category (Industry): 22 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 28.3 acres, this one is smaller than 69% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kottapalli Kovuragunta, Dagadarthi, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Critical Mineral Assessment Programme in Konda Bitragunta, Andhra Pradesh (13 km away).
Other projects nearby
- Transfer of Environmental clearance (EC) from M/s Bhogapuram International… — lapsed, 3.6 km away
- Industrial project by M/s RAMSHY Bio Private Limited — environmental approval granted, 4.1 km away
- Industrial project by M/s RAMSHY Bio Private Limited — cleared for impact study, 4.1 km away
- Industrial project by M/s RAMSHY Bio Private Limited — withdrawn, 4.1 km away
- Industrial project by M/s Gayathri Renewable Fuels and Allied Industries… — environmental approval granted, 4.3 km away
- Industrial project by M/s Gayathri Renewable Fuels and Allied Industries… — cleared for impact study, 4.3 km away
- Sri E. Suresh — environmental approval granted, 4.3 km away
- Mining of Gravel Quarry, M/s Om Sri Sai Srinivasa Minerals, Mg. Pt: Sri I.… — environmental approval granted, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.